Here is a list of some of our references
| location: |
sewage plant in Mohlsdorf |
|||
| system: | XL biofilter modular system | |||
| solution: | emptying of a sludge tank and screening chamber | |||
| amount of air: | 800 m³ per hour at maximum | |||
| operation: | 2008 | |||
| location: |
pumping station "E" Dubai |
![]() |
||
| system: |
2x XL biofilter modular system |
|||
| solution: | purification of H2S-laden exhaust air from a wastewater pumping station, fine cleaning downstream of a chemical scrubber | |||
| amount of air: | 2,500 m³ per hour at maximum | |||
| operation: | 2007 | |||
| location: |
Vowalon, Treuen |
![]() |
||
| system: |
scrubber and hybrid filter |
|||
| solution: | exhaust air treatment system for purification of exhaust air laden with hydrocyanic acid from flame bonding | |||
| amount of air: | 15,000 m³ per hour at maximum | |||
| operation: | 2008 | |||
| location: |
C.H. Müller, Netzschkau |
![]() |
||
| system: |
scrubber and hybrid filter |
|||
| solution: | exhaust air treatment system for purification of exhaust air laden with hydrocyanic acid from flame bonding | |||
| amount of air: | 15,000 m³ per hour at maximum | |||
| operation: | 2008 | |||
| location: |
sewage plant in Räckelwitz |
![]() |
||
| system: |
L modular biofilter system |
|||
| solution: |
emptying of a pressure pipe end sump and a screening channel |
|||
| amount of air: |
60 m³ per hour at maximum H2S loads of up to 700 ppm |
|||
| operation: | 2006 | |||
| location: |
pumping station Merseburg |
![]() |
||
| system: |
hybrid filter L modular system |
|||
| solution: | extraction of exhaust air from pumping station | |||
| amount of air: |
60 m³ per hour at maximum H2S loads of up to 60 ppm |
|||
| operation: | 2009 | |||
| short title: |
BioAmmon |
|||
| research topic: | Sustainable use of leftovers and biowaste by means of anaerobic breakdown and combined sequestration of sulphur and nitrogen from the fermentation products | |||
| partners: |
|
|||
| running time: | 15/12/2006 to 30/06/2008 | |||
| internet: | www.bioammon.com | |||
| short title: |
ZPR |
|||
| research topic: | development of biofilters to reduce odour nuisance due to inorganic sulphur compounds and mercaptans in the paper and cellulose industry | |||
| partners: |
|
|||
| running time: | 01/11/2002 to 30/10/2004 | |||
| short title: |
Exairgie |
|||
| research topic: | Development and investigation of a novel system to recover wastewater heat to be used in heat pumps | |||
| partners: |
|
|||
| running time: | 01/03/2008 to 28/02/2010 | |||
| location: |
Agrargenossenschaft AGROSS e.G., Groitzsch |
|||
| system: |
UGN®-BEKOM system continuous biogas desulphurization without supply of oxygen |
|||
| biogas: |
200 m³ per hour at maximum 2,400 ppm H2S |
|||
| operation: | 20/11/2007 | |||
| location: |
dairy factory Dittmannsdorf |
|||
| system: |
XXL UGN®-BEKOM H system continuous biogas desulphurization with a residual oxygen content of 1 volume percent |
|||
| Biogas: |
400 m³ per hour at maximum 2,000 ppm H2S |
|||
| operation: | 19/11/2008 | |||
| location: |
Sachsenmilch (German dairy) wastewater treatment plant |
![]() |
||
| service: |
|
|||
| location: |
Universitätsklinikum Würzburg |
|||
| service: |
|
|||